DESMAN ASSOCIATES
ABOUT DESMAN
OUR SERVICES
OUR WORK
CONTACT US
CAREERS
CLIENT LOGIN
Value Added Consulting :: Architects + Engineers + Planners + Consultants PlanningConsultingRestorationDesignStudiesTransportation
 
 

Partial Listing of Historic Clients

7th & Collins
Fisher Building
Pittsfield Building
Newberry Plaza
University of Maryland
Baltimore Arena
Gott's Court
Algonquin Apartment Complex
Pomfret Street
Norfolk City Hall
Anne Arundel
Prince George Street
Robert C. Byrd Intermodal
Dalton Parking Garage
Willoughby Tower Building
Historic
Main > Historic > Schlitz Park Parking Structure
PDF   Print   E-mail  
Schlitz Park Parking Garage
Schlitz Park Parking Garage 
 
Type: Historic
Project Name: Schlitz Park Parking Structure
City: Milwaukee
State: WI
Client: The Brewery Works

Features: 479-car, two-bay, three level parking structure designed for one additional future level.

Description: A pre-cast concrete parking structure was built to increase the parking capacity at the prestigious Brewery Works office park in a historic district of Milwaukee, Wisconsin. This parking facility was designed for the parking needs of the current and future tenants. The grade parking in this garage, as well as its two supported levels, have a total of 115,000 square feet. Spanning two-bays wide and standing three levels tall, this structure can park 479 vehicles. The Parking Structure’s façade is composed of pre-cast concrete spandrels. The exterior walls, built with precast concrete spandrels, are open to permit natural lighting and ventilation into the parking areas. The pockets in these spandrels were filled in on-site with the brick that was recovered from the now demolished buildings that were adjacent to the site. This contributed to the assimilation of the garage into this historic neighborhood. The Parking Structure was built on slender steel pile groups over considerable debris from previous work and landfill. Designed on a sloped site, the slab on grade level had to be significantly higher to allow the pre-cast levels to remain horizontal. Signage, revenue control and security features were provided as part of our scope. DESMAN is the Architect and Structural Engineer of Record in the design/build team along with Grunau Project Development.



    Home            Site Map